FEATURED PROJECT: METAL BUILDING REPAIR
- Milford, CT
- Summer 2019
Briarpatch Enterprises hired Pacesetter Construction to perform extensive building repair after a motor vehicle impacted their facility.
- Wall & Column Repair
- Restroom Repair
- Re-Roofing
MORE ABOUT THIS PROJECT
Briarpatch Enterprises hired Pacesetter Construction after a motor vehicle impacted their facility in Milford, CT. The building was a Butler pre-engineered building, and upon inspection, we found multiple damaged wall panels and one building column that was severely damaged. In addition, an interior bathroom suffered extensive damage.
After the success of that project, Briarpatch also hired Pacesetter to perform a 10,000s.f. re-roof to the same building.
“Pacesetter Construction repaired our building after a truck impacted the wall and caused significant damage. Tom Knapp from Pacesetter kept us apprised of progress and the job was completed satisfactorily. I would hire Pacesetter again.” — Briarpatch Enterprises