Call: (203) 483-8209

Natural Gas Explosion

In December 2016 this building suffered extensive damage from a natural gas explosion. Pacesetter Construction supplied material and provided assistance in supervision and labor to get the building back to it’s original condition.

CLIENT:

H. Krevit

LOCATION: