Call: (203) 483-8209

Gulf Oil

In 2006 Pacesetter Construction was contacted by Gulf Oil to design and build a new 3,800sf 2 story terminal at their 500 Waterfront street location.

Pacesetters scope of work was as follows:

  • Foundation & Floor slab
  • New Butler building
  • Full interior fitout
  • All HVAC and plumbing work

What our client had to say:
“Pacesetter Construction designed and built our new building. Their management, workers and sub contractors were of the upmost experienced personnel that provided us with extremely high quality workmanship and a great finished product. All aspects of the total project were performed on a timely basis with no disruption to our normal daily activities. I would highly recommend their services.”
Joe Sierejko
Gulf Oil
New Haven CT.Terminal

CLIENT:

Gulf Oil

LOCATION:

New Haven, CT